Two questions now travel with every bag of coffee bound for the European Union: which plot did it come from, and what packaging is it shipped in. The first is the EU Deforestation Regulation, or EUDR. The second is the Packaging and Packaging Waste Regulation, or PPWR, which has applied in all 27 EU member states since 12 August 2026. Most coffee buyers already know the first question. The second is newer, and it is the one most sourcing teams have not yet built into their specifications.

This guide covers the PPWR side: what it requires of coffee packaging, the substance controls it puts on food-contact materials, the documentation an importer will ask for, and how it sits alongside EUDR on the same shipment.

PPWR packaging compliance for Uganda coffee - Ugandan coffee

What the PPWR is

The PPWR, Regulation (EU) 2025/40, is the European Union's single rulebook for packaging and packaging waste. It replaced the 1994 Packaging and Packaging Waste Directive, which every member state had transposed differently, and it applies directly and uniformly across the EU from 12 August 2026. A regulation is not a guideline to be interpreted; it binds on the day it applies.

Coffee is caught twice. The outer packaging, the jute and polypropylene sacks, cartons and pallet wrap, is packaging in the ordinary sense. The inner layer that touches the bean, where one is used, is food-contact material and carries the substance controls that come with that status.

What your importer will ask for

Under the PPWR, packaging placed on the EU market must be identified and documented. For a coffee lot, an importer's sourcing team needs three things from the exporter, and they all sit on the shipping documentation:

  • Identification by type or batch. Each packaging format is named and tied to the lot it carries, so a batch can be traced to its packaging.
  • Material composition. What the sack, the liner and any food-contact layer are made of, stated by material type.
  • Substance controls. Heavy metals are capped, and PFAS above the regulatory threshold is banned from food-contact packaging. The PFAS restriction has applied since 12 August 2026.

Behind those three sits the technical documentation. The importer must be able to draw up an EU Declaration of Conformity for the packaging, and that declaration rests on the exporter's technical file: the material specification, the supplier declarations for the raw material, and the test or compliance evidence that backs them.

PFAS and heavy metals in food-contact packaging

PFAS, the per- and polyfluoroalkyl substances used for grease and moisture resistance, is the headline change. From 12 August 2026, food-contact packaging containing PFAS above the regulation's threshold cannot be placed on the EU market. For coffee, the practical point is the liner and any coated paper or board that touches the bean.

Heavy metal limits apply the same way. A supplier declaration should state the material and confirm it meets the relevant food-contact limits for the migration of substances into the product.

PPWR requirements at a glance

  • In force across the EU since 12 August 2026
  • Packaging identified by type or batch
  • Material composition stated by type
  • PFAS banned above threshold in food-contact packaging
  • Heavy metals capped
  • Technical documentation supports the importer's EU Declaration of Conformity

How PPWR sits alongside EUDR

The two regulations run in parallel and ask different questions. EUDR asks where the coffee came from and whether the land was deforested. PPWR asks what the coffee travelled in. A lot cannot be compliant with one and not the other; both answers ride on the same shipment.

On the EUDR side, the deadline stands. The regulation applies to most operators from 30 December 2026, and the European Commission's simplification review published in May left the core of the regulation unchanged. What an EU customer will ask for is unchanged too:

  • Geolocation for each plot. A single point, or a polygon if the plot is larger than four hectares.
  • Proof of deforestation-free production. No deforestation on the plot after 31 December 2020.
  • Proof of legality. Production that is legal under the laws of the country of origin.

Uganda is classified as a standard-risk country under the EUDR country benchmarking. That means full due diligence, with no shortcuts.

There is one change worth marking. On 13 July 2026 the Commission adopted a Delegated Act adding soluble, or instant, coffee to the EUDR product scope under CN code 2101 11 00. Green and roasted coffee were already in scope; now the soluble line is too.

One file per batch

The practical output of both regulations is a single compliance file per batch: the plot geolocation, the batch-by-batch traceability and the packaging documentation in one place. That file is what the importer lodges in TRACES NT, the EU system for official controls on goods entering the union. An exporter that can hand over that file with the shipping documents removes the biggest source of friction at the port.

What changes after 2026

The PPWR is phased, and the later phases are where the deeper cost sits. Harmonised labelling rules come next, expected in 2028. Recyclability, recycled-content and reuse targets follow in 2030. A buyer who builds the packaging documentation now is already ahead of both, because the technical file is the foundation the later phases build on.

What to put in a coffee packaging specification

A packaging specification that survives a PPWR check names six things. Write them into the contract so the documentation exists before the container is booked:

  • The packaging format and the batch it carries
  • The material of the sack, the liner and any food-contact layer
  • The PFAS status of the food-contact layer, with the supplier declaration
  • The heavy metal limits met, with the compliance evidence
  • The EU Declaration of Conformity the importer will draw up
  • The TRACES NT file reference for the batch

The buyer's guide covers the registration checks and contracting that sit around this, and the export regulations guide covers the export licence and documentation side.

The short version: EUDR asks which plot the coffee came from, and the 30 December 2026 deadline stands. PPWR asks what packaging it is in, and it has applied since 12 August 2026. Both answers can live in one file per batch, and that file is what gets a Ugandan container through an EU port without a hold. Build the documentation before the coffee ships, and the questions answer themselves.